Telecom product PCBA OEM service, high precision assembly service
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-08-26 01:19
- Browse the number:
81
Company Profile
- H-TEC Electronic Co.Ltd
-
Contact:
gotim(Mr.)
-
Email:

-
Telephone:

-
Area:
Beijing
-
Address:
Third Floor Street of, Love more Than 17 Ling Ling Road, District, Shenzhen, Shenzhen, Guangdong, China (518000)
- Website: http://gotim.ytconsan.com/
By certification [File Integrity]
Product details
Model Number: GTETLPCBA2016033106-#2337
Brand Name: GTE
Key Specifications/Special Features:
We provides both turnkey and consigned services. To provide the promopt accurate quote we like to have the following information:A, Bill of Material (BOM), and if accept quote on alternative parts.B, Typically gerber file includes layer construction info, surface treatment, copper thickness, drilling info, min track width, min clearance distance, etc. and if any special requirement.Assembly DrawingsC, programming and testing instruction/procedures for PCBA or complete product.E, Lot quantity and Annual forecast quantityF, Test specifications or requirements (if applicable)G, Reference product sample, or product photos (if available)H, Special/additional requirements, or known precautions during production process (if any)D, Packing requirements (if any) As a professional though young PCBA factory, We higly appriciates trust from any potential customer, and we take every RFQ seriouse no matter it is from big company, small company even single person. we don't have any MOQ requirement.
Base on our current experience, we can finish prototype within 1-2 weeks and mass produciton orders within 4 to 6 weeks.
Visitors to our factory's production facilities are always welcome. Please contact us to arrange an appointment.
Telephone:+86-755-36626455
Email: [email protected]
Base on our current experience, we can finish prototype within 1-2 weeks and mass produciton orders within 4 to 6 weeks.
Visitors to our factory's production facilities are always welcome. Please contact us to arrange an appointment.
Telephone:+86-755-36626455
Email: [email protected]
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 3 - 15 days
- Dimensions per Unit: 0.1 × 0.05 × 0.03 Meters
- Weight per Unit: 0.15 Kilograms
- Units per Export Carton: 80
- Export Carton Dimensions L/W/H: 0.5 × 0.4 × 0.3 Meters
- Export Carton Weight: 10 Kilograms
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe
New Products
-
Commercial Air Source Heat Pump
price: Negotiable
-
High Temperature Heat Pump
price: Negotiable
-
R32 Inverter Heat Pump
price: Negotiable
-
Domestic Heat Pump Water Heater
price: Negotiable
-
Dc Heat Pump
price: Negotiable
-
Used CAT 480D Crawler Excavator
price: Negotiable




