Plastic injection molded parts for engineering testing devices
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-09-21 12:47
- Browse the number:
64
Company Profile
- Dongguan Gain Power Industries Co. Ltd
-
Contact:
gainpower(Ms.)
-
Email:

-
Telephone:
(86 769) 38871883 Ext:203
-
Area:
Beijing
-
Address:
Jingyang Street, Xianxi New Industried Zone, Chang'an Town, Dongguan, Guangdong, China (523883)
- Website: http://gainpower.ytconsan.com/
By certification [File Integrity]
Product details
Model Number: 345183-#0846
Brand Name: Gain power
Key Specifications/Special Features:
Special features:For special engineering testing machineAnnual usage: 5000 unitsConsist of: plastic injection part, TPE +metal overmolding, silicone rubber partdark gray upper and lower TPE boot are overmolding with metal stamping part, hardware invisible,lack of plastic material is no allowed, no burrs, shrink,embed inserts screws into plastic part, screen plating (EMI)Silicone keypad test, ensure color uniform, housing fit assembly and assembly testing of electronic components by clientWe have much experience in overmolding of rubber on PC/ABS, or embed inserts for screws into plastic parts, make color prints on PC/ABS plasticProduction will be made in house, from product analysis, mold design, mold construction, tryout till approval, mass production and moreThe photos shown of the electronic product we’ve successfully completed for a Russian clientWe gained ISO 9001 certification
The general tolerance for products will be +/- 0.05mm, for special required area, we can reach tolerance+/-0.03mm
We can provide flow analysis as required
OEM orders welcomed
The general tolerance for products will be +/- 0.05mm, for special required area, we can reach tolerance+/-0.03mm
We can provide flow analysis as required
OEM orders welcomed
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 15 - 30 days
Main Export Markets:
- North America
New Products
-
Commercial Air Source Heat Pump
price: Negotiable
-
High Temperature Heat Pump
price: Negotiable
-
R32 Inverter Heat Pump
price: Negotiable
-
Domestic Heat Pump Water Heater
price: Negotiable
-
Dc Heat Pump
price: Negotiable
-
Used CAT 480D Crawler Excavator
price: Negotiable









